Site information.
Time for tea and biscuits..!
Trimming back the overgrown areas.
The finished pathway.
As strange as it may sound, parking in Stag Lane has become an issue..! Having unsuccessfully tried to find a space down by the Vestas factory, it was back up the road to the pond area before the double yellow lines disappeared. Oh well, a good walk to the work site must constitute a warm-up? For once we were all working on the one job, rather than tackling numerous different tasks - and it was hedging. The pathway that runs from the old railway bridge to the mill pond causeway had become somewhat overgrown and the chestnut fencing that ran along one side of it was rather patchy. We were asked to cut back the over hanging material and use it to fill the gaps with dead hedging. Where possible, the team used their hedge laying skills to re-enforce the old fencing. Although there was a few light showers during the morning, we all remained reasonably dry - something of a rarity recently..! This footpath is a considerable distance and we managed to tidy up the whole thing in the one session so well done to all those who attended.
Many thanks to Terry for the photographs.
A message from Alison.
Hi all
As mentioned last week, I am hosting a Macmillan Coffee Morning on:
Friday 29th September
10.00 - 12.30
Venue: 37 Ratcliffe Avenue, Ryde
It would be great to see some of you. All cake-y type donations welcome (or at least a packet of fig rolls!).
Thank you
Alison
No comments:
Post a Comment